bioWAVE getting ready for commissioning

BioPower System (BPS) has begun the diving operations to prepare its bioWAVE wave energy unit for commissioning.

read more →

Gallery: bioWAVE deployment process

BioPower Systems, an Australian wave energy developer, completed the installation of its bioWAVE unit this week as ...

read more →

BPS installs bioWAVE off Australia

BioPower Systems (BPS) has deployed its 250 kW bioWAVE pilot demonstration wave energy unit off Port Fairy, ...

read more →

Image of the day: bioWAVE en route to deployment site

The image taken on November 14, 2015, shows BioPower Systems’ wave energy device bioWAVE heading to the deployment ...

read more →

bioWAVE ready to catch the wave

BioPower Systems has completed the final preparations of its bioWAVE wave energy device ahead of the planned ...

read more →

BioPower’s O-Drive fit for deployment

BioPower Systems’ O-Drive power take-off (PTO) module has been verified for operation by DNV GL. The O-Drive has ...

read more →